Welcome to PEC’s Plan Room!

Requesting plans and specifications from PEC has never been easier!  All you need to do is find the project you are interested in, click on the “CLICK HERE” hyperlink (which will generate an e-mail request), and wait for the plans and specifications to be e-mailed to you AT NO CHARGE.

For a list of who has requested plans and specifications, click on the Plan Holder’s List ICON.

To find out who the apparent low bidder of a project is after the bid date, click on the Bid Tabulations ICON.

Posted in Uncatagorized | Comments Off on Welcome to PEC’s Plan Room!

Bid Tabulations and Plan Holder’s List

CLICK HERE

CLICK HERE

 

Posted in Uncatagorized | Comments Off on Bid Tabulations and Plan Holder’s List

35-170424-000-0135 – Sanitary Sewer & Waterline Improvements to serve Cowley County Community College – Wellington, KS

CLICK HERE to have the plans/specifications emailed to you at no charge.

ADDENDUM NO. 1 POSTED 01/09/2018

Project Engineer:  Trevor Kaufman
Design Engineer:  Gage Sheer
Technician:  Kurtis Dekat

Project Bid Date/Time:  January 11, 2018 @ 10:00am

Project Description:  Installation of approximately 2,400 LF 8″ Sanitary Sewer, 600 LF 12″ Sanitary Sewer, 200 LF of 6″ and 8″ inverted siphon pipe, and 1,800 LF of 8″ waterline.

Contract Documents/Plans can be examined at:

1. City of Wellington, 317 S. Washington, Wellington, KS 67152
2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, KS 67202
3. KCNR, 230 Laura, Suite 101, Wichita, KS 67201

Posted in KS - Wichita | Leave a comment

434-14K60-003-7716 Country Club Road Waterline Extension – Materials – City of Bristow

CLICK HERE to have the plans/specifications emailed to you at no charge.

Project Engineer:  Brian Wintle, P.E.

Design Engineer:  Hayley Normile, E.I.

Project Bid Date/Time:  January 4, 2018 at 10:00 am

Project Description:  Bidding materials only for waterline extension in Bristow, Okla., using CDBG funding.  Project labor and installation of materials will be completed by the City of Bristow.

This project is funded through a Community Development Block Grant and is therefore subject to the provisions and requirements of the Oklahoma Department of Commerce and Housing.  The bidder is responsible for familiarizing itself with the attached SCKEDD Supplemental Project Requirements and adhering to its policies, procedures, and regulations.

Contract Documents/Plans can be examined at:

  1. City of Bristow; 110 W. 7th Street, Bristow, Ok, 74010
  2. Professional Engineering Consultants, P.A.; 4150 South 100th E. Ave. – Suite 401, Tulsa, OK, 74146
Posted in OK - Oklahoma City, Uncatagorized | Leave a comment

35-170555-000-1770 – Rose Hill 2017 Sanitary Sewer Rehab

ADDENDUM NO. 1 POSTED 01/04/2018

CLICK HERE to have the plans/specifications emailed to you at no charge.

Project Engineer:  Matthew Billingslea, P.E.

Design Engineer:  Trevor Kaufman, I.E.

Project Bid Date/Time:  January 8, 2018 at 2:00 pm

Project Description:  The project includes approximately 150 LF of point repairs, 1,200 LF of cured-in-place pipe, 250 LF of new 8″ sanitary sewer, and 16 manhole rehabilitations, 2200 LF of TV inspection is also included.

Contract Documents/Plans can be examined at:

  1. City of Rose Hill; 125 W Rosewood, Rose Hill, KS 67133
  2. Professional Engineering Consultants, P.A.; 303 S. Topeka, Wichita, KS 67202
  3. KCNR; 230 Laura Suite 101, Wichita, KS 67201
Posted in KS - Wichita | Leave a comment