31-160681-000-4319 – Tigua Road Paving Improvements – Phase 1 – Kechi, Kansas

CLICK HERE to have the plans/specifications emailed to you at no charge.

Project Engineer:  Ben Mabry, P.E.

Design Engineer:  Amy Lueking, P.E.

Project Bid Date/Time:  April 12, 2017  1:30pm

Bidders on this work will be required to comply with the President’s Executive Order No. 11246.  Requirements for bidders and contractors under this order are explained in the specifications.

Project Description:  Paving Improvements along Woodlawn and Tigua Road, Kechi, Kansas

Contract Documents/Plans can be examined at:

  1. City of Kechi, 220 W. Kechi Rd., Kechi, KS 67067
  2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, KS  67202
  3. KCNR, LLC., 230 S. Laura, Suite 101, Wichita, KS 672
Posted in KS - Wichita | Leave a comment

CLOSED 35-161218-002-0655 – Waterline Replacement from Pierce Avenue to Tyler Avenue (US-166) along US-77 – Arkansas City, Kansas

Addendum No. 2 posted 3/14/2017

Addendum No. 1 posted 3/13/2017

Project Engineer:  Samantha Dillon

Project Bid Date/Time:  March 15, 2017

Project Description:  Replace approximately 2000 LF of an existing waterline with a new 8-inch waterline along Summit (US-77) from Pierce Avenue to Tyler Avenue.

Contract Documents/Plans can be examined at:

  1.  City of Arkansas City, 118 W. Central, Arkansas City, Kansas 67005-0778
  2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, Kansas 67202
  3.  KCNR, LLC., 230 S. Laura, Suite 101, Wichita, KS 67202
Posted in KS - Wichita | Leave a comment

Welcome to PEC’s Plan Room!

Requesting plans and specifications from PEC has never been easier!  All you need to do is find the project you are interested in, click on the “CLICK HERE” hyperlink (which will generate an e-mail request), and wait for the plans and specifications to be e-mailed to you AT NO CHARGE.

For a list of who has requested plans and specifications, click on the Plan Holder’s List ICON.

To find out who the apparent low bidder of a project is after the bid date, click on the Bid Tabulations ICON.

Posted in Uncatagorized | Comments Off on Welcome to PEC’s Plan Room!

Bid Tabulations and Plan Holder’s List

CLICK HERE

CLICK HERE

 

Posted in Uncatagorized | Comments Off on Bid Tabulations and Plan Holder’s List

35-160682-000-3182 – FY 2017 KLINK 1R Resurfacing Project – Great Bend, KS

CLICK HERE to have the plans/specifications emailed to you at no charge.

Project Engineer:  Bruce Remsberg, P.E.

Project Bid Date/Time:  March 30, 2017 @ 10:00am

Project Description:  Approximately 23,996 Sq. Yds. Milling, 3,630 Tons of HMA Surfacing, Pavement Markings and incidental items thereto.

Contract Documents/Plans can be examined at:

  1. City of Great Bend, City of Clerk’s Office, 1209 Williams, Great Bend, KS 67530
  2. Professional Engineering Consultants, P.A., 104 S. Pine St, Pittsburg, KS 66762
  3. KCNR, LLC., 230 S. Laura, Suite 101, Wichita, KS 67211
Posted in KS - Pittsburg, KS - Wichita | Leave a comment

CLOSED – 331-161094-000-0943 – KLINK 1R Resurfacing Project, FY 2017 – City of Winfield, KS

CLICK HERE to have the plans/specifications emailed to you at no charge.

Project Engineer:  Bruce Remsberg, P.E.

Technician:  Brandon Seiwert

Project Bid Date/Time:  March 29, 2017 @ 1:30pm

Project Description:  U.S.-160 from Loomis Street to College Street – U.S.-77 from 6th Avenue to Manning Street.

Contract Documents/Plans can be examined at:

  1. City of Winfield, KS, Clerk’s Office, 200 East 9th, Winfield, KS 67156
  2. Professional Engineering Consultants, P.A., 104 S. Pine, Pittsburg, KS 66762
  3. KCNR, LLC, 230 S. Laura, Suite 101, Wichita, KS 67211

 

Posted in CLOSED | Leave a comment

CLOSED 31-15221-001-6918 – Medicine Lodge – CID Streetscape – Medicine Lodge, Kansas

 

Addendum No. 2 posted 3/16/17

Addendum No. 1 posted 3/15/17

Project Engineer: Colin K. Costley, P.E.

Design Tech: Carlos Perez

Project Bid Date/Time:  March 17, 2017  10:00 am

Project Description:

Sidewalk improvements along US-281 (Iliff) between US-160 and Stolp Avenue and along US-160 (Fowler) between US-281 and Oak St. including the construction of a pedestrian bridge.  Streetscape improvements along Main St. between US-160 and Central Ave. including bulb-outs, sidewalks, decorative lighting, landscaping and retaining wall construction.

Contract Documents/Plans can be examined at:

  1. City of Medicine Lodge, 114 W. 1st Street, Medicine Lodge, KS 67104
  2. Professional Engineering Consultants, P.A. , 303 S. Topeka, Wichita, KS 67202
  3. KCNR, LLC., 230 S. Laura, Suite 101, Wichita, KS 67211
Posted in CLOSED | Leave a comment

CLOSED 31-161218-000-0655 – Arkansas City – FY 2017 KLINK – Arkansas City, Kansas

Project Engineer: Ben Mabry, P.E.

Design Engineer:  Amy Lueking, P.E.

Project Bid Date/Time:  3/15/2017    1:30pm

Project Description:  Paving Improvements along US-77 (Summit) from Arkansas River to Tyler Avenue

Contract Documents/Plans can be examined at:

  1. City of Arkansas City, 118 W. Central, Arkansas City, KS 67005-0778
  2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, KS  67202
  3. KCNR., 230 S. Laura, Suite 101, Wichita, KS  67211
Posted in KS - Wichita | Leave a comment

CLOSED 34-15557-001-7578 – Wastewater Treatment Facility Improvements – Concordia, Kansas

 

ADDENDUM No. 1    Posted  2/22/2017

ADDENDUM No. 2   Posted  3/1/2017

Project Engineer:  Sarah Unruh

Technician:  Craig Lewis

Project Bid Date/Time:  March 7, 2017 / 1:00 p.m.

Project Description:  Improvements to the wastewater treatment plant including installation of new grit removal equipment, installation of new solids handling equipment, construction of new return activated sludge (RAS) pump station, replacement of  clarifier equipment, replacement of aeration system guide rails, installation of enclosures for aeration system blowers.

 

Contract Documents/Plans can be examined at:

  1. City of Concordia, 701 Washington, Concordia, Kansas 66901
  2. Professional Engineering Consultants, P.A., 303 S. Topeka, Wichita, KS 67202
Posted in CLOSED | Leave a comment

CLOSED 335-15E68-000-0943 – Reconstruction of 12th Avenue – City of Winfield, KS

ADDENDUM NO. 1  POSTED 02-21-17

Project Engineer:  Bruce Remsberg

Technician:  Brandon Seiwert

Project Bid Date/Time:  March 8, 2017 @ 1:30pm

Project Description:  Reconstruct 12th Avenue beginning at K-360 and continuing West for approximately 2,772 feet.

Contract Documents/Plans can be examined at:

  1. City of Winfield, 200 E. 9th, Winfield, KS 67156
  2. Professional Engineering Consultants, P.A., 104 S. Pine St., Pittsburg, KS 66762
  3. KCNR, LLC., 230 S. Laura, Suite 101, Wichita, KS 67211
Posted in Uncatagorized | Leave a comment

CLOSED 331-160476-000-0347 – Griffith Street & Locust Avenue Improvements – El Dorado, KS

ADDENDUM NO. 3 POSTED 02/28/2017

ADDENDUM NO. 2  POSTED 02-24-2017

ADDENDUM NO. 1  POSTED 02-24-2017

Project Engineer:  Bruce Remsberg, P.E.

Technician:  Brandon Seiwert

Project Bid Date/Time:  March 01, 2017 @ 1:30pm

Project Description:  Repave Griffith Street from Locust to Central & Locust Avenue from Vine to Griffith.

Contract Documents/Plans can be examined at:

  1. City of El Dorado; 220 E. First; El Dorado, KS 67042
  2. Professional Engineering Consultants, P.A.; 104 S. Pine; Pittsburg, KS 66762
  3. KCNR, LLC, 230 S. Laura; Suite 101; Wichita, KS 67211

 

Posted in CLOSED | Leave a comment

CLOSED 331-161018-000-0347 – KLINK 1R Resurfacing Project FY 2017 – El Dorado, KS

ADDENDUM NO. 2  POSTED 02-24-17

ADDENDUM NO. 1  POSTED 02-21-17

Project Engineer:  Bruce Remsberg, P.E.

Technician:  Brandon Seiwert

Project Bid Date/Time:  March 01, 2017 @ 1:30pm

Project Description:  Repaving of K-254 (Central Avenue) from Jones St. to Summit St.

Contract Documents/Plans can be examined at:

  1. City of El Dorado; 220 E. First; El Dorado, KS 67042
  2. Professional Engineering Consultants, P.A.; 104 S. Pine; Pittsburg, KS 66762
  3. KCNR, LLC, 230 S. Laura; Suite 101; Wichita, KS 67211

 

Posted in CLOSED | Leave a comment